Iowa DOT News Release



Iowa 38 near Stanwood to close Aug. 9 for pavement replacement #iatraffic

Posted on: August 04, 2017

DAVENPORT, Iowa – Aug. 4, 2017 – Stage 2 of a road construction project to replace the concrete pavement on Iowa 38 from the right of way north of the Union Pacific Railroad’s property to the north corporate limits of Stanwood will require closing the roadway to traffic beginning at 6 a.m. Wednesday, Aug. 9, until late September 2017, weather permitting, according to the Iowa Department of Transportation’s Davenport construction office

Motorists will be detoured around the work zone using U.S. 30, Iowa 1, U.S. 151, and Iowa 38. See map for additional information on this detour route.

Horsfield Construction Inc. of Epworth, Iowa, is the contractor this $2,129,170 project.

The Iowa DOT reminds motorists to drive with caution, obey the posted speed limit and other signs in the work area, and be aware that traffic fines for moving violations are at least double in work zones. As in all work zones, drivers should stay alert, allow ample space between vehicles, and wear seat belts.


The latest traveler information is available anytime through our 511 system. Visit 511ia.org; call 511 (within Iowa) or 800-288-1047 (nationwide); stay connected with 511 on Facebook or Twitter (find links at https://iowadot.gov/511/511-social-media-sites); or download the free app to your mobile device.

To receive email or text alerts about traffic incidents, road closures, traffic delays, and other restrictions that affect this highway route or other routes you travel, the Iowa DOT offers the “Your 511” option on 511ia.org. It’s easy to subscribe to Your 511 and sign up to receive the email/text alerts. Visit https://iowadot.gov/511/511-full-feature-website-help/how-to-videos for simple, step-by-step instructions.

#

Contact: Mark Brandl at 563-391-2750 or mark.brandl@iowadot.us


Iowa highway in the evening