Iowa DOT News Release



Alternating lane closures on westbound I-280 over eastbound I-80 in Scott County begin Aug. 13

Posted on: August 06, 2018

DAVENPORT, Iowa – Aug. 6, 2018 – A bridge deck overlay project on westbound Interstate 280 over eastbound I-80 in Scott County will require alternating lane closures beginning Monday, Aug. 13, until Tuesday, Sept. 25, weather permitting, according to the Iowa Department of Transportation’s Davenport construction office.

During this project, an 11-foot lane width restriction will be in place as well as a 75-foot length restriction. A reduced speed limit of 45 mph will also be in effect.

Hawkeye Paving Corp was awarded this $254,602 project.

The Iowa DOT reminds motorists to drive with caution, obey the posted speed limit and other signs in the work area, and be aware that traffic fines for moving violations are at least double in work zones. As in all work zones, drivers should stay alert, allow ample space between vehicles, and wear seat belts.

The latest traveler information is available anytime through our 511 system. Visit 511ia.org; call 511 (within Iowa) or 800-288-1047 (nationwide); stay connected with 511 on Facebook or Twitter (find links at https://iowadot.gov/511/511-social-media-sites); or download the free app to your mobile device.

To receive email or text alerts about traffic incidents, road closures, traffic delays, and other restrictions that affect this highway route or other routes you travel, the Iowa DOT offers the “Your 511” option on 511ia.org. It’s easy to subscribe to Your 511 and sign up to receive the email/text alerts. Visit https://iowadot.gov/511/511-full-feature-website-help/how-to-videos for simple, step-by-step instructions.

#

Contact: Mark Brandl at 563-391-2750 or mark.brandl@iowadot.us


Iowa highway in the evening