Iowa 4 closing April 29 in Estherville
BRITT, Iowa – April 24, 2009 – The reconstruction project on Iowa 4 in Estherville will require the roadway to close completely beginning April 29, weather permitting, according to the Iowa Department of Transportation’s Britt construction office.
A patching project has been in place on this roadway to prepare for the reconstruction of Iowa 4 from the south city limits to Iowa 9. Beginning April 29, traffic will be detoured using South First Street and Iowa 9. The closure is expected to be in place through the end of September.
The Iowa DOT reminds motorists to drive with caution, obey posted speed limit and other signs in the work area, and be aware that traffic fines for moving violations can more than double in work zones. As in all work zones, drivers should stay alert, allow ample space between vehicles and wear seat belts.
#
Contact: Roy Gelhaus at 641-843-3881 or [email protected]