Traffic to shift on Iowa 187 and Iowa 3 in Fayette County starting Thursday
NEW HAMPTON, Iowa – Aug. 25, 2009 – As part of the ongoing construction of a roundabout intersection at the junction of Iowa 187 and Iowa 3, a traffic shift is set for Thursday, Aug. 27, weather permitting, according to the Iowa Department of Transportation’s (DOT) New Hampton construction office.
Traffic on Iowa 3 will be routed to the completed lanes and circular portion of the roundabout with the south leg of Iowa 187 reopening with access to Iowa 3. During this stage the north leg of Iowa 187 will be closed, the run around removed and paving of the north leg completed. A marked detour will be in place using Fayette County Road W-45 to route this portion of Iowa 187 traffic. This stage is expected to be completed by early October weather permitting.
The Iowa DOT reminds motorists to drive with caution, obey posted speed limit and other signs in the work area, and be aware that traffic fines for moving violations are at least double in work zones. As in all work zones, drivers should stay alert, allow ample space between vehicles and wear seat belts.
#
Contact: Ron Loecher at 641-394-3161 or [email protected]