Iowa DOT News

Update: Road construction work on U.S. 218 near Janesville begins April 2


NEW HAMPTON, Iowa – March 29, 2012 – Road construction work on U.S. 218 near Janesville will resume Monday, April 2, and continue until early November, weather permitting, according to the Iowa Department of Transportation’s New Hampton construction office. Traffic on U.S. 218 will be maintained at all times in various configurations.

Bremer County Road C-50 near Janesville will also be closed at the east intersection with U.S. 218 due to road construction work beginning Monday, April 2, until early November. Later this summer, Barrick Road located on the west side of the intersection will also need to be closed. Motorists will be asked to follow the marked detour route, which uses Black Hawk County roads C-57 and V-25.

The Iowa DOT reminds motorists to drive with caution, obey posted speed li­­­mit and other signs in the work area, and be aware that traffic fines for moving violations are at least double in work zones. As in all work zones, drivers should stay alert, allow ample space between vehicles and wear seat belts.

For traveler information anytime, visit www.511ia.org, call 511 (within Iowa) or 800-288-1047 (nationwide), or follow us on Twitter @StatewideIA511 for all alerts.

Contact: Ron Loecher at 641-394-3161 or [email protected]

 

NOT FINDING WHAT YOU NEED? WE CAN HELP.

©  Iowa Department of Transportation.  All rights reserved.