Iowa DOT News Release



Update: Lane and ramp closures on I-235 in West Des Moines scheduled Oct. 17-20 #iatraffic

Posted on: October 16, 2014

DES MOINES, Iowa – Oct. 16, 2014 – A bridge construction project on Interstate 235 between 60th Street (exit 122) and I-235/I-35/I-80 (exit 123) in West Des Moines will require lane and ramp closures for three more weekends beginning Friday, Oct. 17, weather permitting, according to the Iowa Department of Transportation’s Des Moines construction office.

This weekend, the closures will begin at 8 p.m. Friday, Oct. 17, and will be in place until 6 a.m. Monday, Oct. 20. I-235 will be reduced to one lane in the eastbound direction over I-35 at the west mixmaster in West Des Moines.

Oct. 17-20 traffic impacts

  • Traffic on I-235/I-80 between 60th Street (exit 122) in West Des Moines and I-235 (exit 1A) in West Des Moines will be restricted to one lane in the eastbound direction. An 11-foot-4-inch width lane restriction will be in place.
  • The southbound I-35 to eastbound I-235 loop ramp will be closed, please follow the signed detour.

The Iowa DOT reminds motorists to drive with caution, obey posted speed limit and other signs in the work area, and be aware that traffic fines for moving violations are at least double in work zones. As in all work zones, drivers should stay alert, allow ample space between vehicles, and wear seat belts.

For the latest traveler information anytime, visit www.511ia.org; call 511 (within Iowa) or 800-288-1047 (nationwide); stay connected with 511 on Facebook or Twitter (find links at www.iowadot.com/511/socialmedia.html); or download the free app to your mobile device.

#

Contact: Dan Zeimen at 515-986-2851 or danny.zeimen@dot.iowa.gov

 


Iowa highway in the evening