Iowa 196 in Sac County to close April 4 for reconstruction #iatraffic
CHEROKEE, Iowa – March 24, 2016 – The reconstruction of Iowa 196 in Sac County requires closing the roadway and detouring traffic beginning at 9 a.m. Monday, April 4, until Monday, May 9, weather permitting, according to the Iowa Department of Transportation’s Cherokee construction office.
Iowa 196 traffic will be routed around the construction area using U.S. 71, Sac County Road M-54, and U.S. 20.
Peterson Contractors Inc., of Reinbeck, and Godbersen-Smith Construction Co., of Ida Grove, were awarded this $25.3 million roadway reconstruction project.
The latest traveler information is available anytime through our 511 system. Visit www.511ia.org; call 511 (within Iowa) or 800-288-1047 (nationwide); stay connected with 511 on Facebook or Twitter (find links at www.iowadot.gov/511/socialmedia.html); or download the free app to your mobile device.
To receive email or text alerts about traffic incidents, road closures, traffic delays, and other restrictions that affect this highway route or other routes you travel, the Iowa DOT offers the “My Routes” option on 511ia.org. It’s easy to subscribe to My Reports and sign up to receive the email/text alerts. Visit www.iowadot.gov/511/MyReportsAlerts.html for simple, step-by-step instructions.
The Iowa DOT reminds motorists to drive with caution, obey posted speed limit and other signs in the work area, and be aware that traffic fines for moving violations are at least double in work zones. As in all work zones, drivers should stay alert, allow ample space between vehicles, and wear seat belts.
#
Contact: Steven McElmeel at 712-225-5786 or [email protected]