Iowa DOT News Release



Nighttime lane closures on U.S. 218 in Waterloo begin July 25 #iatraffic

Posted on: July 20, 2016

 

NEW HAMPTON, Iowa – July 20, 2016 – Concrete patching on southbound U.S. 218 from George Wythe State Park in Waterloo to the Iowa 27/Iowa 57/Iowa 58 interchange will begin Monday night July 25. The contractor will utilize lane closures to complete the patching in stages within the following allowable hours: Sunday nights from 10 pm until 7 a.m. and between 7 p.m. and 6 a.m. weekdays (Monday through Friday). Weather permitting, the project is expected to be completed by late August, according to the Iowa Department of Transportation’s New Hampton construction office.

The Iowa DOT reminds motorists to drive with caution, obey the posted speed limit and other signs in the work area, and be aware that traffic fines for moving violations are at least double in work zones. As in all work zones, drivers should stay alert, allow ample space between vehicles, and wear seat belts.

The latest traveler information is available anytime through our 511 system. Visit www.511ia.org; call 511 (within Iowa) or 800-288-1047 (nationwide); stay connected with 511 on Facebook or Twitter (find links at www.iowadot.gov/511/socialmedia.html); or download the free app to your mobile device.

To receive email or text alerts about traffic incidents, road closures, traffic delays, and other restrictions that affect this highway route or other routes you travel, the Iowa DOT offers the “My Routes” option on 511ia.org. It’s easy to subscribe to My Reports and sign up to receive the email/text alerts. Visit www.iowadot.gov/511/videos.html for simple, step-by-step instructions.

#

Contact: Ron Loecher at 641-394-3161 or ron.loecher@dot.iowa.gov



Iowa highway in the evening