Iowa DOT News

Overnight lane closures on I-35 at U.S. 30 interchange in Ames begin Wednesday night Oct. 31


AMES, Iowa – Oct. 30, 2018 – Road construction work at the Interstate 35/U.S. 30 interchange in Ames will require closing the northbound lanes of I-35 from 9 p.m. Wednesday, Oct. 31 until 5 a.m. Thursday, Nov. 1. Closure of the southbound lanes of I-35 will start at 10 p.m. Wednesday, Oct. 31, and end at 5 a.m., Thursday, Nov. 1, weather permitting, according to the Iowa Department of Transportation’s Jefferson construction office.

The eastbound U.S. 30 off-ramp to northbound I-35 will be closed from 7 p.m. to 5 a.m. Wednesday, Oct. 31 to Thursday, Nov. 1.

Motorists will be detoured around the closures on north- and southbound I-35 using Iowa 210, U.S. 69, South Dayton Avenue, 13th Street, and I-35.

The Iowa DOT reminds motorists to drive with caution, obey the posted speed limit and other signs in the work area, and be aware that traffic fines for moving violations are at least double in work zones. As in all work zones, drivers should stay alert, allow ample space between vehicles, and wear seat belts.

The latest traveler information is available anytime through our 511 system. Visit 511ia.org; call 511 (within Iowa) or 800-288-1047 (nationwide); stay connected with 511 on Facebook or Twitter (find links at https://iowadot.gov/511/511-social-media-sites); or download the free app to your mobile device.

To receive email or text alerts about traffic incidents, road closures, traffic delays, and other restrictions that affect this highway route or other routes you travel, the Iowa DOT offers the “Your 511” option on 511ia.org. It’s easy to subscribe to Your 511 and sign up to receive the email/text alerts. Visit https://iowadot.gov/511/511-full-feature-website-help/how-to-videos for simple, step-by-step instructions.

#

Contact: Jenny Hoskins at 515-386-8166 or [email protected]

NOT FINDING WHAT YOU NEED? WE CAN HELP.

©  Iowa Department of Transportation.  All rights reserved.