Iowa DOT News Release



Update: Iowa 149 opening delayed one week due to weather

Posted on: December 06, 2018

CHARITON, Iowa – Dec. 6, 2018 – The Iowa 149 bridge over Cedar Creek north of Ottumwa will not open the second week of December as previously planned due to recent significant weather events, according to the Iowa Department of Transportation’s Chariton construction office.

Iowa DOT staff hope to reopen the Iowa 149 roadway and bridge to traffic the third week of December, weather permitting.

United Contractors, Inc., the contractor for the project, originally expected to complete the bridge project by November 2018.  However, the need to reschedule the deck pour and significant weather events have delayed the opening of the Iowa 149 bridge.

We continue to appreciate your patience and apologizes for any inconvenience this may cause. 

The Iowa DOT reminds motorists to drive with caution, obey the posted speed limit and other signs in the work area, and be aware that traffic fines for moving violations are at least double in work zones. As in all work zones, drivers should stay alert, allow ample space between vehicles, and wear seat belts.

The latest traveler information is available anytime through our 511 system. Visit 511ia.org; call 511 (within Iowa) or 800-288-1047 (nationwide); stay connected with 511 on Facebook or Twitter (find links at https://iowadot.gov/511/511-social-media-sites); or download the free app to your mobile device.

To receive email or text alerts about traffic incidents, road closures, traffic delays, and other restrictions that affect this highway route or other routes you travel, the Iowa DOT offers the “Your 511” option on 511ia.org. It’s easy to subscribe to Your 511 and sign up to receive the email/text alerts. Visit https://iowadot.gov/511/511-full-feature-website-help/how-to-videos for simple, step-by-step instructions.

#

Contact: Hector Torres-Cacho at 641-469-4007 or hector.torres-cacho@iowadot.us

 

 


Iowa highway in the evening