Iowa DOT News Release



Update: Nighttime lane closures on I-35 in Warren County begin Wednesday, May 19

Posted on: May 11, 2021

CHARITON, Iowa – May 11, 2021 – Nighttime construction work to remove the Fillmore Street bridge over Interstate 35 in Warren County will require closing north- and southbound I-35 for up to six nights from the junction with Iowa 92 (exit 56) to the junction with Iowa 5 (exit 68) from 10 p.m. to 5 a.m. nightly from Wednesday, May 19, through Wednesday, May 26, weather permitting according to the Iowa Department of Transportation’s Chariton construction office.

Southbound I-35 nighttime lane closures are scheduled for:

  • Wednesday, May 19
  • Thursday, May 20

Northbound I-35 nighttime lane closures are scheduled for:

  • Friday, May 21
  • Monday, May 24
  • Tuesday, May 25
  • Wednesday, May 26

During these nighttime lane closures, traffic will be guided around the work zone by digital message boards and a marked detour using Iowa 5, Iowa 28 and Iowa 92 (see map).

The Iowa DOT reminds motorists to drive with caution, obey the posted speed limit and other signs in the work area, and be aware that traffic fines for moving violations are at least double in work zones. As in all work zones, drivers should stay alert, allow ample space between vehicles, and wear seat belts.

The latest traveler information is available anytime through our 511 system. Visit 511ia.org; call 511 (within Iowa) or 800-288-1047 (nationwide); stay connected with 511 on Facebook or Twitter (find links at https://iowadot.gov/511/511-social-media-sites); or download the free app to your mobile device.

It’s easy to subscribe to Your 511 and sign up to receive the email/text alerts. Visit https://new.511ia.org/#login to sign up. For instructions and help for this feature, visit https://www.511ia.org/help/section/how-to-create-and-manage-a-511-account.html.

#

Contact: Hector Torres-Cacho at 641-469-4007 or hector.torres-cacho@iowadot.us


Iowa highway in the evening