Iowa DOT News

Traffic switch on northbound U.S. 218 at the bridge over Black Hawk Creek in Waterloo Monday night, Aug. 23


NEW HAMPTON, Iowa – Aug. 20, 2021 – Bridge joint replacement work on north- and southbound U.S. 218 from Black Hawk Creek to northbound U.S. 63 in Waterloo will require a traffic switch at the bridge over Black Hawk Creek in Waterloo beginning on Monday night, Aug. 23, until mid-October, weather permitting, according to the Iowa Department of Transportation’s New Hampton construction office.  

During this stage of the project, the entrance ramp onto northbound U.S. 218 will be closed and traffic will follow a marked detour route using Westfield Avenue, Fletcher Avenue, and the U.S. 218 frontage road.

For more information about this and other Iowa DOT construction projects in Black Hawk and Bremer counties, follow the Black Hawk and Bremer County Construction Facebook page at www.facebook.com/BlackHawkBremerCo#!BlackHawkBremerCo

The Iowa DOT reminds motorists to drive with caution, obey the posted speed limit and other signs in the work area, and be aware that traffic fines for moving violations are at least double in work zones. As in all work zones, drivers should stay alert, allow ample space between vehicles, and wear seat belts.

The latest traveler information is available anytime through our 511 system. Visit 511ia.org; call 511 (within Iowa) or 800-288-1047 (nationwide); stay connected with 511 on Facebook or Twitter (find links at https://iowadot.gov/511/511-social-media-sites); or download the free app to your mobile device.

It’s easy to subscribe to Your 511 and sign up to receive the email/text alerts. Visit https://new.511ia.org/#login to sign up. For instructions and help for this feature, visit https://www.511ia.org/help/section/how-to-create-and-manage-a-511-account.html.

#

Contact: Ron Loecher at 641-394-3161 or [email protected]

NOT FINDING WHAT YOU NEED? WE CAN HELP.

©  Iowa Department of Transportation.  All rights reserved.