Iowa 25 north of the I-80 interchange (exit 86) in Guthrie County is now open to traffic
CRESTON, Iowa – Sept. 19, 2023 – If you are driving on northbound Iowa 25 near the interchange with Interstate 80 you will now be able to travel north to reach Menlo and Guthrie Center. Construction crews have completed their project of removing and replacing the pavement on Iowa 25 north of I-80.
Help keep everyone on the road safer. Drive with caution, obey the posted speed limit and other signs in the work area, and be aware that traffic fines for moving violations are at least double in work zones. As in all work zones, you should stay alert, allow ample space between vehicles, and wear seat belts.
The latest traveler information is available anytime through our 511 system. Visit 511ia.org; call 511 (within Iowa) or 800-288-1047 (nationwide); stay connected with 511 on Facebook or Twitter (find links at https://iowadot.gov/511/511-social-media-sites); or download the free app to your mobile device.
It’s easy to subscribe to Your 511 and sign up to receive email/text alerts. Visit https://new.511ia.org/#login to sign up. For instructions and help with this feature, visit https://www.511ia.org/help/section/how-to-create-and-manage-a-511-account.html.
#
Contact: Brian Smith, Creston construction office, at (641) 782-4310 or [email protected]