Tell us what you think about a proposed bridge replacement over East Otter Creek on Iowa 39 in Crawford County
AMES, Iowa – May 14, 2024 – The Iowa Department of Transportation is requesting your input on a proposed bridge replacement on Iowa 39 over East Otter Creek, 0.4 miles east of Cherokee County road M-35.
Construction on the bridge includes making it longer and wider. The new bridge will be 150 feet long by 40 feet wide. Construction is expected to begin in the spring of 2026 and end in the fall of 2026.
Comments about the proposed bridge replacement can be made at: https://bit.ly/iowadotcom5846 Comments are due by Monday, May 24, 2024.
For general information regarding the public meeting, Shane Tymkowicz P.E., Assistant District Engineer, Iowa DOT District 3 Office, 6409 Gordon Drive, Sioux City, Iowa 51106, phone 712-274-5834 or 712-276-2822, email [email protected]
Please contact the person listed above if you need information in another language or if you need an interpreter. We will provide these at no cost to you.
Favor de notificar la persona listado arriba si necesita información en otro idioma o si necesita un traductor. Se lo proporcionaremos sin costo a usted.
Find information on any DOT project at www.iowadot.gov/pim. There are several ways to keep informed about projects in your area.
#
Iowa DOT ensures nondiscrimination and equal employment in all programs and activities in accordance with Title VI and Title VII of the Civil Rights Act of 1964 and other nondiscrimination statutes. If you need more information or special assistance for persons with disabilities or limited English proficiency, contact Iowa DOT Civil Rights at 515-239-1111 or by email at [email protected].