Iowa DOT News

Tell us what you think about a proposed bridge replacement on U.S. 30 over Boyer River in Crawford County


PIM_US30-BoyerRiverBridgeReplacement-CrawfordCoAMES, Iowa – Jan. 8, 2025 – Tell us what you think about a planned bridge replacement on U.S. 30 over Boyer River in Crawford County (Event # 6406). 

Construction is scheduled to begin in 2028.

Traffic will be detoured during construction. The proposed detour would follow U.S. 59 to County Road E59 into Dow City. Access to properties will be maintained at all times.

SHARE YOUR FEEDBACK

PROJECT PLANS

For questions about the project or for free translation services, contact:
Sarah Tracy, P.E. Transportation Planner
Iowa DOT District 3 Office, 6409 Gordon Drive, Sioux City, Iowa 51106,
Phone: 712-276-1451 or Email: [email protected]

Favor de notificar la persona listado arriba si necesita información en otro idioma o si necesita un traductor. Se lo proporcionaremos sin costo a usted.

#

Iowa DOT ensures nondiscrimination and equal employment in all programs and activities in accordance with Title VI and Title VII of the Civil Rights Act of 1964 and other nondiscrimination statutes. If you need more information or special assistance for persons with disabilities or limited English proficiency, contact Iowa DOT Civil Rights at 515-239-1111 or by email at [email protected].

NOT FINDING WHAT YOU NEED? WE CAN HELP.

©  Iowa Department of Transportation.  All rights reserved.