Iowa DOT News

Tell us what you think about a proposed bridge replacement on U.S. 65 in Cerro Gordo County



PIM_US65-CedarRiverBridgeReplace-CerroGordoCoAMES, Iowa – Jan. 8, 2025 – Tell us what you think about the proposed bridge replacement on U.S. 65 over the West Fork Cedar River in Cerro Gordo County (Event # 6366).

Proposed Improvements Include:

  • Removing and replacing the existing bridge.
  • Re-align South 120th Street to accommodate new bridge.
  • Reconstruct approach pavement.
  • Update guardrail to current standards.

Traffic will be staged in two phases during the project. Thru traffic will be maintained through the first phase of the project, and then maintained via an off-site detour through the remainder of construction. Construction is expected to start in the spring of 2026 and end in the fall of 2026.

SHARE YOUR FEEDBACK BY MONDAY, JANUARY 20
Learn about the project and share your feedback. You will need to provide your name and zip code before viewing the information.

VIEW PROJECT PLANS

  • Plans to be provided later by design

Project Display

 

For questions about the project or for free translation services, contact:  

Pete Hjelmstad, Field Services Coordinator
Iowa DOT District 2 Office
428 43rd Street SW, Mason City, IA 50401
Phone: 641-423-7548 or 800-477-4368, Email: [email protected]

Favor de notificar la persona listado arriba si necesita información en otro idioma o si necesita un traductor. Se lo proporcionaremos sin costo a usted.


#

Iowa DOT ensures nondiscrimination and equal employment in all programs and activities in accordance with Title VI and Title VII of the Civil Rights Act of 1964 and other nondiscrimination statutes. If you need more information or special assistance for persons with disabilities or limited English proficiency, contact Iowa DOT Civil Rights at 515-239-1111 or by email at [email protected].

NOT FINDING WHAT YOU NEED? WE CAN HELP.

©  Iowa Department of Transportation.  All rights reserved.