share your feedback on projects & studies



U.S. 75 in Plymouth County

About the Project

Project description

The Iowa Department of Transportation is requesting public input for the proposed reconstruction of U.S. 75 in Plymouth County. The project extends from north of Maple Street in Hinton to 0.1 miles south of 2nd Street in Merrill, a distance of 5.99 miles

Construction of the project is expected to begin in 2023.

Through traffic on U.S. 75 will be maintained at all times.


Display ad

mapmarker

Map Search

FIND IT ON THE MAP

Find the project location on our interactive map. Share your thoughts about a project or study and view feedback.

Project displays

Project contact

Shane Tymkowicz, P.E., assistant district engineer
Iowa DOT District 3 Office
2800 Gordon Drive
Sioux City, Iowa 51102
712-276-1451 or 800-284-4368
shane.tymkowicz@iowadot.us

Deadline for receipt of comments is Aug. 11, 2020; however, all correspondence received after this date will be included in the project files and reviewed as the project is developed. To submit a comment online about this project, go to: https://bit.ly/iowadot3443..


Iowa bridge