share your feedback on projects & studies



U.S. 69 Bridge Replacement, Wright County

About the Project

Project description

The Iowa Department of Transportation is requesting public input for a proposed bridge replacement on U.S. 69 over Drainage Ditch 5 near Galt, approximately 3.7 miles south of Iowa 3, in Wright County.

The proposed project involves replacing the existing 32’ x 44’ single span I-beam bridge with a 12’ x 10’ reinforced concrete box culvert. This project will also include removal of the bridge guardrails and bridge rails, as well as a 3” hot mix asphalt (HMA) overlay.

Construction of the project is expected to begin in 2023.

U.S. 69 will remain open to traffic with lane closures as necessary during construction.


mapmarker

Map Search

FIND IT ON THE MAP

Find the project location on our interactive map. Share your thoughts about a project or study and view feedback.



Project displays



Project contact

Pete Hjelmstad, field services coordinator
Iowa DOT District 2 Office
428 43rd Street SW
Mason City, Iowa 50401
Email: pete.hjelmstad@iowadot.us

Deadline for receipt of comments is Aug. 10, 2021; however, all correspondence received after this date will be included in the project files and reviewed as the project is developed. To submit a comment online about this project, go to: www.bit.ly/iowadot13642



Iowa DOT ensures nondiscrimination and equal employment in all programs and activities in accordance with Title VI and Title VII of the Civil Rights Act of 1964. If you need more information or special assistance for persons with disabilities or limited English proficiency, contact Tonnette R. Harris, J.D., Civil Rights Bureau Director at 515-509-8814.
Iowa bridge