U.S. 65 from U.S. 30 in Story County to Iowa 175 in Hubbard
About the Project
Project description
The Iowa Department of Transportation is requesting public input for proposed improvements on U.S. 65 from 0.5 mile South of U.S. 30 in Story County to Iowa 175 in Hubbard. The proposed project involves five single box culvert replacements.
Construction of the project is expected to begin in 2023.
Through traffic on U.S. 65 will be detoured at two separate locations. The southern detour will use U.S. 30, 650th Avenue and Story County Road E-41 (around Colo). The northern detour will use Story County Roads E-18, Story / Hardin County Road S-27 and Iowa 175.
Project contact
Allison Smyth, P.E., Assistant District Engineer
Iowa DOT District 1 Office
1020 S. Fourth St.
Ames, IA 50010
Phone: 515-239-1635 or 800-899-0623
Email: [email protected]
Comments and questions regarding the online meeting should be received by Jan. 24, 2022. To submit a comment or question regarding this project, go to: https://bit.ly/iowadot4645 .
We are piloting REACH a mobile web app that gives you a new way to stay involved and interact with Iowa DOT projects. Create your REACH account at this link: https://reach.iowadotpi.com/.Then, use the REACH app to easily submit comments, register for public meetings or view the “At Your Own Pace” online meetings without logging into the system again. Because it’s optimized for use on a mobile device, commenting and keeping up to date on Iowa DOT projects will be more convenient than ever.