Proposed bridge replacement on Iowa 14 over Flood Creek
About the Project
Project description
The Iowa Department of Transportation is providing information online and requesting public input for the proposed bridge replacement on Iowa 14 over Flood Creek, 3.6 miles south of County Road B-45.
The proposed project includes the removal and replacement of the existing bridge structure as it is at the end of its intended lifecycle. Construction of the new bridge is expected to begin in 2024.
A detour will be in place during construction, which will include County Road B-60 east from the junction of IA 14 and County Road B-60 to County Road T-47, then north on County Road T-47 to its junction with IA 14. For more information, see the website listed below.
Project contact
Jacob Page, District Design Engineer
Iowa DOT District 2 Office
428 43rd St. SW
Mason City, IA 50401
Phone 641-423-7584 or 800-477-4368
Email: [email protected]
Comments and questions regarding the online meeting should be received by February 28, 2022. To submit a comment or question regarding this project, go to: https://bit.ly/iowadot4665
We are piloting REACH a mobile web app that gives you a new way to stay involved and interact with Iowa DOT projects. Create your REACH account at this link: https://reach.iowadotpi.com/.Then, use the REACH app to easily submit comments, register for public meetings or view the “At Your Own Pace” online meetings without logging into the system again. Because it’s optimized for use on a mobile device, commenting and keeping up to date on Iowa DOT projects will be more convenient than ever.